ThirdAxis® EBS Pvt. Ltd. is a registered company of ThirdAxis Enterprises, incorporated with a dedication to innovative solutions including, but not limited to, construction industry software. With our extensive knowledge in the construction industry of more than two generations, we understand precisely the key points to address as a software solution provider.

Play Video

Clients We Served Over the Years

1985

Mass Earth Filling work, internal roads work, Compound walls construction for Momin Nagar Project at Jogeshwari West, Mumbai which was one of the largest residential building project of that time and took 5 years for completion.

1990

Construction of large Electric Sub-Station along with power distribution centers, Cable trench, Construction of Internal Roads, Construction of Compound Wall with fencing for Kamalistan Studio at Andheri, Mumbai

1993

Huge excavation for basements, Concrete pavements and Compound wall constructions for Jogeshwari Education Trust`s Millat School & Millat Hospital Project at Jogeshwari West Mumbai. Qty Above 25000 Cubic meters

1994

Huge Excavation with over 3 million cubic meter (31,50,000 Cu.M) of earth & rock cutting on an average of 4000 to 5000 cubic meters of excavation every day during the period 1994 to 1996 for K. Raheja Construction – Raheja Vihar Project

1993

Earth Cutting, Rock & Concrete Cutting, Earth Filling Excavation for huge basement for M/s. Satellite Group for their project at Kandivali West. Mumbai. Quantity above 100,000 cubic meters

1993

Earth Cutting, Rock & Concrete Cutting, and Earth Filling Excavation for basement for M/s. Satellite Group for their project at Kandivali West. Mumbai.

1993

Earth Cutting, Rock & Concrete Cutting, and Earth Filling Excavation for basement for M/s. Satellite Group for their project at Kandivali West. Mumbai.

1996

Mass Earth Filling for leveling up a deep valley with hundreds of thousands cubic meters near Aarey Colony for Kalpana Construction Studio at Andheri, Mumbai

1996

Mass Earth Filling work of over 400,000 cubic meter for M/s. Kalpana Construction for their projects at Amboli, Veera Desai Road, Andheri West, Mumbai (formerly known as Amboli Stone Quarry).

1998

Huge Earth Cutting work over hundreds of thousands cubic meters for Essar Petroleum & Reliance Petroleum Projects.Mumbai. Qty Above 25000 Cubic meters

2000

Huge Earth Cutting & Rock cutting work over 1,00,000 cubic meters for Mumbai Pune Expressway Project for Larsen & Toubro and Shapoorji Pallonji under Contractors Mr. T. Y. Kalya & Mr. Yashwant Sable respectively.

2002

Construction of  G+18 storey buildings at Powai, Andheri East, Mumbai for M/s. J.C. Builders also known as J.C. Bhagtani . Area 89,000 sq. ft

2002

PHASE 1 – Huge Excavation for double basement with quantity of 58,000 cubic meters. Completed in 4 months’ time frame for K. Raheja Construction.

2003

Beautification of old dumping ground by cutting & levelling the huge quantity of soil heap (around 90,000 cubic meters) to help landscaping slop behind Inorbit Mall, Mindspace, Malad West, Mumbai for K. Raheja Corporation.

2003

20 meter wide, 5 meter deep x 0.6 Km long open Canal construction without diversion which included heavy earth cutting & filling over 85,000 cubic meters. Completed within 6 months for K. Raheja Corporation.

3

2004

Earth Cutting, Rock & Concrete Cutting, Earth Filling Excavation for huge basement for M/s. Satellite Group for their project at Kandivali West. Mumbai. Quantity above 100,000 cubic meters

65

2004

Earth Cutting, Rock & Concrete Cutting, and Earth Filling Excavation for basement for M/s. Satellite Group for their project at Kandivali West. Mumbai.

2004

Earth Cutting, Rock & Concrete Cutting, and Earth Filling Excavation for basement for M/s. Satellite Group for their project at Kandivali West. Mumbai.

2006

PHASE 2 – Huge Excavation for double basement with quantity of 52,000 cubic meters. Completed in 2 months’ time frame for K. Raheja Construction for infinity mall Andheri

2006

Excavation for basement & construction of a 8 meter tall RCC building at Retreat Hotel, Mud Island, Malad West, Mumbai for M/s. K. Raheja Construction

2006

PHASE 2 – Huge Excavation for double basement with quantity of 52,000 cubic meters. Completed in 2 months’ time frame for K. Raheja Construction for infinity mall Andheri

2008

Building Construction G+1 for Indian Western Railways under A.B. Construction at Mahim East. Area 14,000 sq.ft.

2009

Building construction of G+7 Storey building 70,000 sq. ft. for Fem Group`s Shanti Developers at Nalasopara East, Maharashtra

2011

Building Construction of G+5 Storey building 14,000 sq.ft. for Sat-Guru Developers at Mahim West, Mumbai

2012

Huge Excavation & Rock Cutting for water pipe laying project for our client M/s. My Associates at Nashik . 20 kilometers

2014

Technical Consultation & Training of QTPL`s Civil Engineering team to improve reinforcement productivity & minimize rebar scrap, prepare bar bending schedules & placing drawing using innovative cad tools. QTPL are one of the precast contractors of Reliance Petroleum Refinery Project. 

2014

18 Storey Building with huge basement, ground floor & 2 podiums around 180,000 sq.ft. for Sat-Guru Developers at Thane Ghodbunder Road, near Hyper City Mall. All RCC work have been completed. Balance work of plaster & brick masonry is at completing stage.

2015

23 storey building construction completed at Grant Road East, Mumbai for Shagun Developers. Area 77,000 sq.ft

1997-2016

Mind Space & Palm Court Projects (formerly Mindspace as a whole, Plot 504, Malad West) is the largest construction project in Mumbai which started in the year 1999 and spread over an area of hundreds of acres. We have been working closely with K.Raheja Corporation since before their split into 3 groups. This project consisted of number of huge excavations, buildings, Internal Roads, Concrete pavements, large sized concrete culverts & other infrastructure with a project space of about 20 years as estimated by K. Raheja Group. Listed below are our key roles in this project

Huge excavation with help of dozens of earth-moving machinery & hundreds of trucks for leveling up the 225 acre plot. From 1997 to 2000. Millions of cubic meters of soil carted away from the plot.

Huge excavation for basements of most of the giant buildings standing tall at the mind space project starting from the Toyota Showroom till Intelinet IT Park. Except the Inorbit mall project, where we have worked side by side as a team with the other excavation contractor.

  • Construction of all the Internal Concrete Roads at Mind Space.
  • Construction of Concrete Box Culvert sized avg. 3m x 3 m from Toyota showroom till Creek – 0.55 km
  • Construction of most of the concrete pavements along the buildings in Mindspace Project
  • All Concrete box culverts & storm water drain across the MindSpace Project.
  • Most of big & small construction, Excavations & Earth Fillings as needed.

2011- To 2019

Providing Innovative Solutions & Consultation for Construction Industry in India in partnership with International Software & Machine Partners.

January 2020

Launching BendPlus, India`s own reinforcement steel software solution. Keeping mind the requirements in the region and budget without compromising the quality & output. 